Has BIM Modified MEP Design Workflow?

The MEP design and set up workflow includes quite a few stakeholders and events which can be collectively chargeable for overseeing a collection of phases that can consequence within the constructing engineering (or constructing services) to be deliberate, designed, spatially coordinated, fabricated, put in, commissioned and maintained. Usually, the constructing services design stage follows the preliminary architectural design, from which level it could possibly often be designed in parallel with additional architectural in addition to structural design adjustments.

The engineering groups that usually design constructing services options are often in certainly one of two teams. The primary group is often the constructing designer, often known as the marketing consultant engineer or the design engineer. It’s the function of the design engineer to work carefully with the architect to develop the general constructing engineering components together with lighting, cooling, heating, drainage, waste, hearth prevention and safety services. Historically, the design engineer is not going to be concerned within the detailed spatial design of those services. As a substitute the detailed spatial design and set up would usually be dealt with by the second social gathering, often called the MEP contractor (M&E contractor) or commerce contractor. The MEP or commerce contractor is chargeable for evolving the preliminary marketing consultant design right into a workable and installation-ready constructing services resolution.

In some cases, there may be additionally a third social gathering concerned – the fabricator, who can be chargeable for creating MEP elements similar to ductwork or pipework components or in some circumstances pre-fabricated options that encompass pipework, electrical ladder, plumbing, ductwork and sprinkler inside a body (module) that’s delivered to web site for set up in risers, plant rooms and corridors.

This text is anxious with the function of the MEP designer and MEP contractor, particularly, the main target for this text is to debate how BIM (Constructing Data Modelling) has influenced the MEP design workflow between the designer and the contractor.

Present MEP BIM Workflow Choices

Basically there are 5 completely different MEP design workflow eventualities that presently exist and these can be mentioned within the article. They’re as follows

 

  1. Conventional 2D design and 3D BIM coordination
  2. 3D MEP design and 3D BIM coordination
  3. Designers 3D BIM design and coordination
  4. Contractor 3D BIM design and coordination
  5. Normal contractor 3D model coordination

 

Conventional 2D Design and 3D BIM Coordination

Contemplating the standard MEP method first, that is the place a marketing consultant will create 2D design outputs, which embody 2D plan layouts, 2D sections and MEP (M&E) schematics. It will point out the design intent for the constructing primarily based on the use specified by the architect. As soon as the marketing consultant has accomplished this design data he’ll cross on the data to an MEP contractor who can be chargeable for creating the MEP coordinated resolution. This text assumes that the contractor will create a spatially coordinated 3D BIM model utilizing BIM instruments similar to Revit MEP and Navisworks. The contractor will use the design data and create an installation-ready resolution which takes into consideration set up, effectivity of pipe runs or duct bends, area for lagging and hanging the services, entry for submit set up upkeep and so forth. This conventional MEP method, from a 2D design to a 3D model has existed for the previous couple of many years and permits the contractor so as to add extra data into the model that can be utilized by him and by services management firms after the set up. Using the 3D tool similar to Revit is after all helpful as it’s an clever model, with parametric elements and due to this fact, in addition to permitting the contractor to determine and resolve clashes earlier than any time is spent on web site, it has different makes use of and purposes the place model ‘data’ is used and relied upon.

3D MEP Design and 3D BIM Coordination

The second workflow technique is extra straight influenced by BIM. Because the MEP designer, one will use BIM instruments to create a 3D model and related drawings throughout his preliminary design section (reasonably than a 2D design) earlier than this data is handed throughout to an MEP commerce contractor. The MEP design engineer will usually create a 3D model as a consequence of buyer specs and necessities for a BIM model, as in lots of circumstances a federated model (which mixes the opposite disciplines in a single model) is required by the shopper for a weekly assessment and therefore the MEP marketing consultant can not merely present a set of 2D drawings. On this workflow, the BIM model is successfully a 3D illustration of what would in any other case be a 2D deliverable. It’s going to due to this fact encompass areas the place additional adjustments are nonetheless wanted by a commerce contractor. Such examples embody the usage of library gadgets reasonably than particular MEP commerce contractor procured components which may be used within the model. The creation of a 3D BIM model at this stage by the marketing consultant can also be topic to a number of architectural and structural model adjustments. These have a knock-on impact on the MEP resolution as it’s successfully a work-in-progress model for MEP with fixed architectural and structural adjustments and due to this fact won’t ever have the identical degree of effectivity, by way of structure of services, in comparison with an MEP model the place the architectural and structural fashions are frozen. The draw back of this workflow technique is after all the additional time taken to create a BIM model by the marketing consultant workforce. Added to this concern is the truth that 3D modelling experience and abilities inside a consulting engineering workforce can typically be restricted. As soon as the marketing consultant completes his model and passes it to the MEP contractor, the choice as as to if the contractor ought to adapt the model or begin the modelling course of from the beginning is actually primarily based on the standard of the model to begin with. In actuality each eventualities will exist, in some circumstances the MEP commerce contractor is best off beginning the BIM model once more utilizing solely the 2D design drawings which can be created by the marketing consultant from his BIM model, whereas in some uncommon circumstances the commerce contractor will use the consultants MEP BIM model and adapt and modify it together with his adjustments, to make the model prepared for set up. In each eventualities, the MEP contractor will all the time look to make worth engineering additions and adjustments to the model in addition to procurement led model adjustments.

Designers 3D BIM MEP Design and Coordination

The third MEP design workflow technique is a extra pure and direct consequence of BIM and it really additionally begins to advertise the good thing about BIM extra considerably because it will get nearer to ‘digital design and building’ goals of the business. On this workflow the method of design engineer is to create a BIM model that’s spatially coordinated and that’s utilizing the precise specified elements for the challenge. Usually, the marketing consultant throughout this section could have an extended time period to create the model, permitting him to soak up the adjustments from structural and architectural disciplines as they progress by means of the detailing phases. The truth that the model is then coordinated with the construction and structure in addition to different MEP services permits the marketing consultant to create a model that’s being created in keeping with an set up commonplace that’s now extra usable by an installer or fabricator. When the model on this workflow technique is handed on to a contractor, the contractor should want to make remaining adjustments and changes in a spherical of worth engineering. Usually, the contractor will use the identical model on this workflow and make adjustments to the model offered by the MEP design marketing consultant. Moreover, it’s possible that the marketing consultant engineer is not going to have offered invert (peak) ranges or dimensions from gridlines and partitions for the MEP services on his drawings. In such circumstances the contractor will due to this fact need to create extra element within the drawings, however once more contractor might use the marketing consultant’s drawings and progress them in additional element for his/her use.

Contractor 3D Design and Coordination

The fourth workflow technique includes MEP contractors (or commerce contractors) taking over the design accountability in addition to the coordination accountability. While the coordination accountability is a longtime skillset with expertise of creating detailed and complete vertical and horizontal methods for coordination being a part of the contractor’s core abilities, the design accountability is a brand new factor for the contractor. This was historically often called a design and construct method; nonetheless, it’s now turning into more and more frequent particularly in circumstances the place firms are looking for to have fast design and detailed coordination accomplished. Usually, the elements for use can be specified by the tip shopper, permitting the contractor to design and model earlier than creating his detailed coordinated drawings from the model, to permit set up and fabrication if wanted. The explanation that this explicit workflow technique will not be the preferred at current is solely because of the quantity of labor out there and likewise the design accountability that additionally needs to be assumed as typically, contractors might not want to settle for this threat or certainly they could not have the sources to finish the design work. For this workflow technique to exist in any respect implies that the contractor has to make use of design workers straight and supply design legal responsibility insurance coverage to permit him to design the MEP resolution in addition to set up it. The advantage of this workflow choice is clearly the time effectivity that’s realized and due to this fact the fee profit, as the price of utilising contractor useful resource will often be decrease in comparison with costly design engineering companies. Nonetheless, it does include some threat because the design experience that design engineers possess can’t be simply replicated by contractors, even when they do make use of in-house groups.

Normal Contractor 3D Model Coordination

The fifth variant of MEP design workflow is predicated on creating coordinated MEP fashions just like the standard 2D to 3D method however for a special buyer group. On this workflow technique a 2D architectural, structural and MEP design that’s for use by a most important contractor (or basic contractor) is then progressed right into a 3D BIM model by the contractor to evaluate the validity and completeness of the model. In some circumstances, a few of the design components from the completely different disciplines could also be introduced in 3D whereas others could also be in 2D. It is usually potential that completely different disciplines might present fashions in numerous software program that will or might not current software program interoperability challenges. In such cases, a workforce will usually be employed to make use of the design information from architectural, structural and MEP designers to then create a 3D BIM model primarily based on precise information. The purpose is to determine any inconsistencies within the design information by figuring out any clashes within the model, permitting the contractor in such a workflow technique to successfully mitigate his/her potential threat. Any issues discovered inside the model are often handed again to the designers to make amendments to their 2D design for subsequent adjustments to the 3D BIM model which is finally owned by the principle contractor. This BIM workflow resolution is turning into much less frequent now as a result of MEP contractors and designers are creating BIM fashions themselves bim modeling.

In abstract, BIM has launched quite a few new workflow variants to the MEP design services sector. The beforehand tried and trusted technique of a 2D design, from a designer, that was developed right into a 3D coordinated MEP model by contractor is now not the workflow resolution used as companies now have many different variants and options obtainable. Together with BIM Modeling, different developments within the building sector, together with collaborative online working and work sharing have additionally contributed to the uptake ranges for BIM and impacted the adjustments to workflow.

By way of the MEP design workflow choices, the preferred of those as we transfer ahead would be the third choice, which is the marketing consultant making a BIM model that’s spatially coordinated, or the fourth choice which is the contractor taking over the design accountability in addition to creating the coordinated BIM model. Each choices are successfully a change to the standard method for MEP design and each level to a single supply for the model and drawings versus the historic two-tier design method. All choices mentioned would require competent BIM coordination and MEP modelling groups and sources. XS CAD, with its giant MEP coordination workforce and MEP engineering design workforce, which consists of mechanical and electrical engineering professionals, is effectively positioned to cope with such initiatives for firms primarily based within the USA, UK, Canada, Australia and New Zealand. As all are areas the place BIM is now the popular resolution, XS CAD, with greater than 16 years’ expertise and a presence in every market is a perfect choice for such firms.

Author: admin